52000PR250029224 USCGC BEAR POTABLE DEIONIZED WATER SYSTEM REPAIR

1 Intent- This work item describes the requirements for the Contractor to remove the existing potable water deionization system, clean and inspect the Feedwater Storage Tank (4-94-1-W), and install new potable water deionization system on USCGC BEAR.

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6 as supplemented with additional information in this notice. This solicitation is issued as a Request for Quote Number 52000QR250029224. This procurement will be processed in accordance with FAR Part 12.

The North American Industry Classification System (NAICS) is 2213. The small business size standard is 1250. This is a total small business set aside; all responsible small business sources may submit proposals that will be considered. This synopsis/solicitation is issued pursuant to FAR 13.106-1(b), and the resultant purchase order will be awarded on a firm-fixed price basis using simplified acquisition procedures in accordance with FAR 13.


THE UNITED STATED COAST GUARD SURFACE FORCE LOGISTICS CENTER REQUEST THE CONTRACTORS TO PROVIDE PRICING FOR THE FOLLOWING REQUIREMENT:

The contractor shall provide 52000PR250029224 USCGC BEAR POTABLE DEIONIZED WATER SYSTEM REPAIR

  1. Potable Water Deionization System; Renew

1. SCOPE

1.1 Intent. This work item describes the requirements for the Contractor to remove the existing potable water deionization system, clean and inspect the Feedwater Storage Tank (4-94-1-W), and install new potable water deionization system on USCGC BEAR.

1.2 Government-furnished property.

None.

2. REFERENCES

COAST GUARD DRAWINGS

Coast Guard Drawing 901 WMEC 533-015, Rev -, Deionization Water Treatment System Mods

Coast Guard Drawing 901 WMEC 801-020, Rev H, Booklet of General Plans

COAST GUARD PUBLICATIONS

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements

Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures

OTHER REFERENCES

American National Standards Institute/NSF International (ANSI/NSF) 61, 2015, Drinking Water System Components - Health Effects

American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2011, Disinfection of Water-Storage Facilities

ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates

3. REQUIREMENTS

NOTE

Ships Force to provide Culligan or equivalent fiberglass tanks per Coast Guard Drawing 901 WMEC 533-015 GFE Table.

3.1 General.

3.1.1 CIR.

None.

3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).

3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, (Interferences). Known interferences include, but are not limited to the following:

  • Sheathing
  • Bulkhead insulation
  • Piping
  • Foundation
  • Ladderwell

NOTE

Coast Guard personnel will operate all shipboard machinery and equipment.

3.2 Operational test, initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Submit a CFR.

3.3 Tank, clean and inspect. The Contractor must complete the following for Feed Water Storage Tank (4-94-1-W).

3.3.1 Plug log. The Contractor must keep a written record of all plugs put in any tank’s vents. A separate list must be kept for each tank being entered.

3.3.1.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.

3.3.1.2 Ensure the plug log is available to the Coast Guard inspector when the inspector is performing his close-out inspection on each tank.

3.3.2 Content removal. The Contractor must remove and dispose of 306 gallons of fluids and/or residues in accordance with all applicable Federal, state, and local regulations. The Contractor must notify the Dockmaster prior

Set-Aside: Total Small Business Set-Aside (FAR 19.5) (SBA)

Place of Performance: Portsmouth, Virginia, UNITED STATES

NAICS Codes:
2213

Files:

Here are other similar opportunities for you

FAC: FWP 382: Chancery : Potable Water - 2

SAM.gov

Aug 15, 2026 Past Due

Renovation of Water Treatment System

SAM.gov

Aug 29, 2025 Past Due

Pipelines Upgradation and Installation Works

SAM.gov

Aug 20, 2025 Past Due