Solicitation Number: W912QR25BA005
Date Added: February 20, 2025
The scope of the project includes a detailed survey of the area. A geotechnical investigation was conducted to confirm the soil materials and analyze the method of failure. The bank will be cleared of all vegetation. It is proposed to install a riprap ditch along the edge of the road and connect to the top of the riprap. The method of streambank restoration is to backfill the eroded area with filter stone and class I riprap.
Set-Aside: Total Small Business Set-Aside (FAR 19.5) (SBA)
Place of Performance: Vermilion, Illinois, UNITED STATES
NAICS Codes:
237990
Files:
SAM.gov
Sep 17, 2026 Active
SAM.gov
Sep 16, 2026 Active