Solicitation Number: 15BFA024B00000029

Date Added: January 30, 2025

Description:

01/29/2025: Abstract of Offers published in the attachments section.

01/14/2025: Amendment 0005 issued. This amendment incorporates Questions and Answers, update Wage Determination. See attachments for complete details.

01/03/2024: Amendment 0004 issued. This amendment extends the bid opening due date to Wednesday, January 29, 2025 at 12:30 PM CST. See attachment for details.

12/20/2024: Amendment 0003 issued. This amendment incorporates Questions and Answers, update Wage Determination. See attachments for complete details.

12/09/2024: Amendment 0002 issued. This amendment incorporates an extention to the Bid Opening Date to Wednesday, January 8, 2025 at 12:30 PM CST. See attachments for complete details. NOTE: RESPONSES TO BIDDER QUESTIONS ARE EXPECTED TO BE ISSUED VIA AMENDMENT AT A LATER DATE.

11/15/2024: Amendment 0001 issued. This amendment incorporates site visit meeting minutes with sign in sheet, updated Wage Determinationand extends the Bid Opening Date to Wednesday, December 11, 2024 at 12:30 PM CST. See attachments for complete details. NOTE: RESPONSES TO BIDDER QUESTIONS ARE EXPECTED TO BE ISSUED VIA AMENDMENT AT A LATER DATE.

The Federal Bureau of Prisons (FBOP) herein issues solicitation 15BFA024B00000029 for the award of a firm-fixed-price construction contract for a project entitled Replace Roofs Phase III at the Federal Correctional Institution (FCI) Oxford, located in Oxford, Wisconsin.

FCI Oxford is a federally owned facility located at 350 Elk Ave, Oxford, WI 53952.The project consists of the following:

FCI Oxford proposes to have an outside roofing contractor remove and dispose of the existing rock ballasted EPDM flat roof system and underlying insulation, down to the decking from the southern portion of the Central Complex roof (approximately 10,500 sqft.) and the ten (10) inmate housing unit roofs (approximately 125,000 sqft.). The total area to be completed is approximately 135,500 sqft.

Access to the roofs will be from the exterior, via ladder/lifts. The elevation for the Central Complex roof is approximately 15ft. and the elevation for the ten housing unit roofs ranges from 11 ft. -15ft. The above-mentioned roofs were tested and found to be positive for asbestos, see the attached Specifications for Asbestos Abatement. The contractor is responsible for complying with all local. state, and federal rules, regulations, and  codes. Prior to beginning abatement, the contractor shall submit an abatement plan to the Bureau of Prisons for review.

The contractor will haul the existing rock to an on-site location identified by FCI Oxford. The contractor will remove the membrane and roof insulation. The decking will be cleaned by means of power broom and air blower. All surfaces to be primed or sprayed with SPF will be clean, dry, and free of all oil, grease, dirt and contaminants.

The contractor will apply an approved primer according to manufactures application directions. The contractor will spray apply an approved (Nominal 70 Compressive Strength, HFO blown, closed cell. with an approximate R-value of 6. 6 per inch) insulated polyurethane foam roof system to approximately 10,500 sqft. of the Central Complex roof and to approximately 125,000 sqft. of the ten (10) inmate housing unit roofs. The polyurethane foam thickness will average 6. 5" to 7" and receive a topcoat of 40 mils acrylic elastomeric coating with reinforcement fabric. Each “pass” or layer of the SPF should be at least 0. 5 inches (13 mm) and no more than 1.5 - 2.0 inches (38 - 51 mm) thick. Allow at least 10 minutes between each pass for cure and cooling. The SPF must extend up roof protrusions for a minimum of 8" (or above the slush line, whichever is greater) above the finished roof surface. SPF application shall be limited to that which can be completed to full SPF thickness in the same day. All exposed foam tie-in end laps and side laps must be primed at the end of each workday. If the SPF is not applied over the primed area within 72 hrs the primer must be reapplied and allowed to fully dry before continuing work. A protective coating or covering should be applied over the SPF the same day as the application or within 24 hours. Prior to application of the SPF, the substrate should be between 50° - 130°F (10° - 54°C). SPF will not be applied when moisture, such as, rain, fog, frost, dew, high humidity (>85% R.H.}, or unsatisfactory environmental conditions are present. The finished surface of the SPF must be protected from the adverse effects of sunlight. The industry standards for roof pitch/slope shall be followed for the spray foam application to achieve a minimum of R-40 value throughout the roof. The completed SPF surface shall be smooth to coarse orange peel texture.

Du

Set-Aside: Total Small Business Set-Aside (FAR 19.5) (SBA)

Place of Performance: Oxford, Wisconsin, UNITED STATES