app.rfpplanner.com

Opportunity Details

Solicitation Number: 36C26325Q0334

Date Added: January 07, 2025

Description:

THIS IS A SOURCES SOUGHT NOTICE ONLY. This is not a solicitation for bids, proposals, proposal abstracts, or quotations. The purpose of this Sources Sought Notice is to obtain information regarding the availability and capability of qualified sources to perform the potential requirement. This sources sought notice is part of Market Research effort and invites contractors capable of fulfilling the requirement in accordance with the Statement of Work and Salient Characteristics.  The responses received from interested contractors will assist the Government in determining the appropriate acquisition method. The Department of Veterans Affairs (VA), Network Contracting Office (NCO) 23, is conducting market research to identify potential sources which can provide the following:  STATEMENT OF WORK MOLD REMEDIATION SERVICES INTRODUCTION/BACKGROUND Air quality testing in a VA building, revealed levels of airborne microbial particles that exceed an acceptable level for a healthcare facility. Due to this hazard, the building has been vacated of all patients and staff and will remain so until it is safe to occupy. PROJECT OBJECTIVE Remediation services to remove or clean all surfaces and materials located inside Building. Building to be placed under negative pressure, with additional units to be used as air filtrations. HVAC system to be isolated, all diffusers removed, cleaned, then set aside, all flex ducting to be removed (to later be replaced), and all duct openings to be sealed. All carpet in the building to be removed. All ceiling tiles in the building to be removed. All drywall (including above the drop ceiling) that has microbial growth or moisture damage to be removed. All pipe and ductwork insulation showing evidence of growth or moisture damage to be removed. All building semi and non-porous surfaces - such as but not limited to cabinetry, countertops, metal, glass, rubber baseboards, lighting and plumbing fixtures - needs to be thoroughly disinfected via appropriate cleaning methods. SPECIFICATIONS MOLD REMEDIATION TECHNICAL SPECIFICATIONS PART 1 GENERAL SCOPE This specification covers the remediation of mold including removal, cleanup and disposal of mold contaminated materials from a VA building. The methods and procedures in this specification are based on the observations and previously collected background air samples. An estimate of the amount of material to be removed or cleaned is not given. The determination of the actual amounts, for bidding purposes, is the responsibility of the Contractor. By submitting a bid, the Contractor acknowledges that he has investigated and satisfied himself as to: The conditions affecting the work, including, but not limited to, physical conditions of the site which may affect site access, handling and storage of tools and materials, access to water, electricity or other utilities, or otherwise affect performance of required activities. The character and quantity of all surface and subsurface materials or obstacles to be encountered as far as this information is reasonably ascertainable from an inspection of the site, including exploratory work done by the Building Owner or a designated consultant, as well as information presented in drawings and specifications included with this Contract. Any failure by the Contractor to acquaint himself with available information will not relieve him from the responsibility for estimating properly the difficulty or cost of successfully performing the work. The Building Owner is not responsible for any conclusions or interpretations made by the Contractor on the basis of the information made available by the Building Owner. DESCRIPTION The work specified herein shall be the remediation of mold by competent persons trained, knowledgeable and qualified in the techniques of remediation, handling and disposal of mold contaminated materials and the subsequent cleaning of contaminated areas, who comply with all applicable Federal, State and local regulations and are capable of, and willing to perform, the work of this Contract. The Contractor shall supply all labor, materials, services, insurance, permits, licenses, patents, and equipment necessary to carry out the work in accordance with all applicable Federal, State and local regulations and these Specifications. The Contractor is responsible for restoring the work area and auxiliary areas utilized during the remediation to conditions at least equal to original conditions. (This excludes any material removed as part of scope.) Any damages caused during the performance of remediation activities shall be repaired by the Contractor (e.g., paint peeled off by barrier tape, nail holes, water damage, broken glass) at no additional expense to the Owner. APPLICABLE STANDARDS AND GUIDELINES All work under this Contract shall be done in strict accordance with all applicable Federal, State, and Local regulations, standards, and codes governing mold remediation and any other tra

Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)

Place of Performance: N/A, N/A, N/A

NAICS Codes:
562910

Files:

Here are other similar opportunities for you

Tar Lake Superfund

SAM.gov

Sep 21, 2026 Active

6923G226Q000028 Delano hall Tank

SAM.gov

Sep 14, 2026 Active