app.rfpplanner.com

Opportunity Details

Solicitation Number: 70Z085Q11258

Date Added: March 01, 2025

Description:

General Requirements 

  1. SCOPE     

Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.     

  1. REFERENCES     

COAST GUARD DRAWINGS   

Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements  

Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans  

Coast Guard Drawing 750-WMSL-436-011, Rev E, Fire Detection Sys Deck Plan (ASC436009)  

Coast Guard Drawing 750-WMSL-436-013, Rev C, Fire Detection Sys Cable Running Sheets (ASC436010)  

Coast Guard Drawing 750-WMSL-436-014, Rev -, Fire Detection and Control System Schematic (ASC436028)   

COAST GUARD PUBLICATIONS   

Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements  

Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard Electrical Cable Test  

Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation  

Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures  

Coast Guard Technical Publication (TP) 9919, SWBS 436, Feb 2022, Fire and Smoke Detection System (For Hull 757)   

OTHER REFERENCES   

National Fire Protection Association (NFPA) 72, 2022 Edition, National Fire Alarm and Signaling Code  

   

         3. REQUIREMENTS   

3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.   

 

3.2 Materials. The Contractor must obtain all of the materials required to complete this job with the exception of the Government-furnished Property shown in Paragraph 1.2 of Work Item.    

 

3.3. Period of Performance. The period of performance window for this work starts on 09 April 2025 and ends on 01 July 2025.   

 

3.4. Location. The Contractor must perform the work while the USCGC MIDGETT (WMSL 757) is alongside the pier on 400 Sand Island Pkwy Honolulu, HI 96819-4326.    

 58300_RTK_1023_418 

  1. Dual Point Davit, Biennial Maintenance, Perform

1.  SCOPE 

1.1 Intent.  This work item describes the requirements for the Contractor to perform Biennial Maintenance on Dual Point Davit listed in Table 1. 

TABLE 1 – DUAL POINT DAVIT NAMEPLATE DATA

description 

LOCATION 

davit total gross weight 

Allied Systems Dual Point Davit with Control Console

Models: DDP11000CTS & SP2200

Weather Deck, STBD Side, Frame 47

29,000 lbs

1.2 Government-furnished property

MTI 

ITEM DESCRIPTION 

NSN/PN 

QTY 

ESTIMATED COST ($/UNIT) 

Y

CB-OTH Mark IV

(Coast Guard Drawing 26B-CB-IV-801-001)

N/A

1 ea.

N/A

Y

Hook

Model APR-356-CBH

2 ea.

5000.00

2.  REFERENCES 

Coast Guard Drawings 

Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements 

Coast Guard Drawing 418A-WMSL-801-001 Rev A, Booklet of General Plan 

COAST GUARD PUBLICATIONS 

Coast Guard Technical Publication (TP) LR-H5-0002-V0, SWBS 583, Oct 2023, Boat Davit - Models DDP11000CTS & SP2200 (Hull 757) 

Coast Guard Technical Publication (TP) 9618, S

Set-Aside: Total Small Business Set-Aside (FAR 19.5) (SBA)

Place of Performance: Honolulu, Hawaii, UNITED STATES

NAICS Codes:
336611

Files:

Here are other similar opportunities for you

Aviation Availability: USCGC RELIANCE FY27 AA

SAM.gov

Oct 02, 2026 Active

MRPO - Modular Barge

SAM.gov

Sep 21, 2026 Active

USS MIGUEL KEITH (ESB-5) ROH FY27

SAM.gov

Sep 26, 2026 Active