Solicitation Number: 70Z085Q250011354
Date Added: February 27, 2025
THIS WILL BE AWARDED UNDER LOWEST PRICE TECHNICALLY ACCEPTABLE AND PAST PREFORMANCE.
STATEMENT OF WORK (SOW)
FOR
USCGC SLEDGE (WLIC-75) UNDERWATER HULL REPAIR
CGC SLEDGE has water intrusion through the hull below the forward potable water tank and requires repair for the tasks outlined in this SOW.
1.0 GENERAL
1.1 BACKGROUND
During routine rounds, approximately one inch of water was observed in the bilge beneath the forward potable water tank. After pumping out the accumulated water, it was noted that water was seeping back through the hull at an estimated rate of one quart per hour. The affected area exhibits significant corrosion and requires immediate repair or replacement.
The scope of this contract is defined by the efforts and tools required to support
CGC SLEDGE. The Contractor shall provide all labor, materials, and tools necessary to make repairs.
The objective is to inspect and effect repairs or to replace section/sections of the hull plating that has significant corrosion as to improve and return CGC SLEDGE to recommended working, safe condition.
1.4.2 Coast Guard Publications
(SFLC Std Spec 0000), 2022, General Requirements.
(SFLC Std Spec 0740), 2022, Welding and Allied Processes.
(SFLC Std Spec 6310), 2022, Preserve Ship Structures.
2.0 SPECIFIC REQUIREMENTS/TASKS
Unless otherwise stated, this contract applies to on-site support for CGC SLEDGE in Baltimore, MD.
2.1 UNDERWATER HULL PLATING
The Contractor shall perform any inspections or evaluations, as deemed necessary, to determine best path forward prior to commencing work.
2.2 TEST THOROUGHLY AND DOCUMENT
The Contractor shall ensure the underwater hull plating is fully functional by performing a system operational test to be witnessed by CGC SLEDGE Engineering Petty Officer (EPO) or the EPO’s designated representative.
2.2.1 The Contractor shall provide a trip report documenting all findings no later than 48 hours after returning to the home office.
3.0 CONTRACTOR PERSONNEL
The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
4.1 PERIOD of Performance
The period of performance for this contract shall not exceed 14 calendar days from the date of award.
4.2 PLACE OF PERFORMANCE
The primary place of performance will be at the location awarded, CGC SLEDGE,
2401 Hawkins Point Rd. Baltimore, MD 21226 unless an alternate location is approved by the U.S. Coast Guard. Access to this location/installation will be coordinated with the CGC SLEDGE EPO.
4.3 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occ
Set-Aside: Total Small Business Set-Aside (FAR 19.5) (SBA)
Place of Performance: Curtis Bay, Maryland, UNITED STATES
NAICS Codes:
336611
Files:
SAM.gov
Sep 14, 2026 Active