Solicitation Number: 70Z085Q250011324
Date Added: February 25, 2025
General Requirements
COAST GUARD DRAWINGS
Coast Guard Drawing 26B-CB-IV-801-001, Rev -, Booklet of General Plans
Coast Guard Drawing 35-LRI-II-801-001, Rev -, General Arrangement
Coast Guard Drawing 418A-WMSL 801-001, Rev A, Booklet of General Plans
Coast Guard Drawing 750-WMSL-320-579, Rev -, Electrical Installations Iwo New Aft Folding Cranes
Coast Guard Drawing 750-WMSL-583-508, Rev -, Installations IWO Aft Folding Cranes
Coast Guard Fleet Drawing FL-1702-11, Rev -, Inspection of Sheaves
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 7903, SWBS 583, Oct 2021, Aft Boat Handling System –Model FB90-28
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
OTHER REFERENCES
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2020, Power Tool Cleaning to Bare Metal
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements of this WI apply to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.2 Materials. The Contractor must obtain all of the materials required to complete this job with the exception of the Government-furnished Property shown in Paragraph 1.2 of Work Item.
3.3. Period of Performance. The period of performance window for this work starts on 09 April 2025 and ends on 01 July 2025.
3.4. Location. The Contractor must perform the work while the USCGC MIDGETT (WMSL 757) is alongside the pier on 400 Sand Island Pkwy Honolulu, HI 96819-4326
58310_MLA_0225_418
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to inspect, perform maintenance, and test folding boom cranes listed in Table 1.
TABLE 1 – LIST OF FOLDING BOOM CRANEs
Crane
LOCATION
MANUFACTURER / MODEL NUMBER
coast guard tech pub
Crane No. 2
Main Deck, Port Side, Aft of Frame 95
Appleton Marine Inc. / FB90-28
7903
Crane No. 4
Main Deck, Port Side, Aft of Frame 90
Appleton Marine Inc. / FB90-28
7903
Crane No. 3
Main Deck, STBD Side
Appleton Marine Inc. / FB90-28
7903
1.2 Government-furnished property.
MTI
ITEM DESCRIPTION
NSN/PN
QTY
ESTIMATED COST ($/UNIT)
Y
*CB-OTH Mark IV
(Coast Guard Drawing 26B-CB-IV-801-001)
N/A
1 ea.
N/A
Y
*Long Range Interceptor II
(LRI-II) Cutter Boat
(Coast Guard Drawing 35-LRI-II-801-001)
N/A
1 ea.
N/A
2. REFERENCES
Coast Guard Drawings
Coast Guard Drawing 26B-CB-IV-801-001, Rev -, Booklet of General Plans
Coast Guard Drawing 35-LRI-II-801-001, Rev -, General Arrangement
Coast Guard Drawing 418A-WMSL 801-001, Rev A, Booklet of General Plans
Coast Guard Drawing 750-WMSL-320-579, Rev -, Electrical Installations Iwo New Aft Folding Cranes
Coast Guard Drawing 750-WMSL-583-508, Rev -, Installations IWO Aft Folding Cranes
Coast Guard Fleet Drawing FL-1702-11, Rev -, Inspection of Sheaves
Coast Guard Publications
Set-Aside: Total Small Business Set-Aside (FAR 19.5) (SBA)
Place of Performance: Honolulu, Hawaii, UNITED STATES
NAICS Codes:
336611
Files:
SAM.gov
Sep 14, 2026 Active