app.rfpplanner.com

Opportunity Details

Solicitation Number: SPRPA125REG29

Date Added: March 07, 2025

Description:

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| TIME OF DELIVERY (JUNE 1997)|20|0001AA|20 EA|365 DAYS AFTER FAT APPROVAL|0001AB|1 LO|180 DAYS ADO||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|INVOICE AND RECEIVING REPORT (COMBO)|TBD|TBD|TBD|TBD|TBD|TBD|TBD||||||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (OCT 2024)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM-BASIC (FEB 2024)|11|||||||||||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2024)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2025)|12|332439|500||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| 1. SCOPE 1.1 PRE-AWARD / POST AWARD REQUIREMENTS: Due to the critical use of this item and its quality history, a pre-award survey and post-award conference may be required for all new manufacturers. For all previous sources, a post-award conference may be recommended. 1.2 Container shell material is ;Plastic; . 1.3 When discrepancies exist between these requirements and those on current manufacturer's drawings,contact code ;BUYER ON PAGE 1 OF CONTRACT; or code N241.10 1.4 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;ZERO MANUFACTURING; drawing number ( ;98376; ) ;48-135248; , Revision ;Latest; and all details and specifications referenced therein. 1.5 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.6 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 1.7 Manufacturing process is ;Molded; . 2. APPLICABLE DOCUMENTS DOCUMENT REF DATA=MIL-I-45208 | | |A |810724|A| 1| | 3. REQUIREMENTS 3.1 One third (1/3) unit of desiccant (MIL-D-3464, Type II nondusting) per cubic foot of container interior volume shall be placed in desiccant holder of each container at time of shipment. 3.2 Reference to Cadmium plating shall be deleted and the following substituted: "Finish shall be electrodeposited alkaline Zinc-Nickel Alloy in accordance with ASTM B 841 Class 1, Type B, Grade 3." Contact code ;BUYER ON PAGE 1 OF CONTRACT; or code N241.10 to arrange for First Article Test location Container nameplate will be in accordance with direction given by BUYER ON PAGE 1 OF CONTRACT AT award of contract. When a First Article is required, the contractor shall submit a paper copy of the drawings (size 11" X 17"), contracts and approved ECP's ECO's, deviations waivers, and modifications in the records recepticle or inside the container submitted for the First Article. THIS IS A MULTI APPLICATION CONTAINER AND WILL NOT REQUIRE SERIAL NUMBERS. All containers must be affixed with a nameplate that includes a Unique Identification (UID) marking as referenced in the drawing package Drawing ;(80132) 15930; and IAW Mil-STD-130 latest revision. The contractor shall contact NAVICP code ;CONTACT BUYER ON PAGE 1; or code 0771.10 for the alphanumeric sequential serial number group that makes up part of the UID. The UIDwill be included on the nameplate in data matrix format. 4. QUALITY ASSURANCE 4.1 100% Production Leak Tests. Each container shall be prepared for testing by sealing all breathing devices and inserting pressurizing fittings and gauges. The container shall be closed and sealed in a normal manner. The Pneumatic - Pressure Technique of Method 5009 of Federal Test Method Standard NO. 101C shall be used to detect leakage. An initial pressure setting equal to .25 + 0.1-0 PSIG shall be used. After stabilization, pressure shall be monitored for thirty minutes. Any loss in pressure in excess of 0.05 PSIG (adjusted for changes in temperature and barometric pressure) shall be cause for rejection. Any deformation of the container shell, while pressurized, which is greater than three quarters of an

Set-Aside: N/A (N/A)

Place of Performance: N/A, N/A, N/A

NAICS Codes:
332439

Here are other similar opportunities for you

81--SHIPPING AND STORAG

SAM.gov

Oct 14, 2026 Active

Container - TRICONS

SAM.gov

Sep 18, 2026 Active