app.rfpplanner.com

Opportunity Details

Solicitation Number: N0038324RP227

Date Added: February 07, 2025

Description:

ITEM UNIQUE IDENTIFICATION AND VALUATION (JAN 2023)|19|||||||||||||||||||| HIGHER-LEVEL CONTRACT QUALITY REQUIREMENT|8|X|||||||| INSPECTION AND ACCEPTANCE OF SUPPLIES|26|X||||||||||||X|||||||||||||| TIME OF DELIVERY (JUNE 1997)|20||||||||||||||||||||| STOP-WORK ORDER (AUG 1989)|1|| FMS DELIVERY AND SHIPPING INSTRUCTIONS|3|||N52211.12, N52211.73, N52211.11| WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)|16|invoice and receiving report combo type||TBD|N00383|TBD|TBD|See Schedule|TBD|||TBD|||||| NAVY USE OF ABILITYONE SUPPORT CONTRACTOR - RELEASE OF OFFEROR INFORMATION (3-18))|1|| VALUE ENGINEERING (JUN 2020)|3|||| EQUAL OPPORTUNITY (SEP 2016)|2||| SMALL BUSINESS SUBCONTRACTING PLAN (DOD CONTRACTS)- BASIC (DEC 2019)|2||| INTEGRITY OF UNIT PRICES (NOV 2021)|1|| WARRANTY OF SUPPLIES OF A NONCOMPLEX NATURE (JUN 2003)|6|12 months|60 days after discovery of defect||||| SMALL BUSINESS SUBCONTRACTING PLAN (SEP 2023)|4||||| EQUAL OPPORTUITY FOR WORKERS WITH DISABILITIES (JUN 2020)|2||| TRANSPORTATION OF SUPPLIES BY SEA (JAN 2023)|2||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM - BASIC (FEB 2024))|11|||||||||||| LIMITATION OF LIABILITY--HIGH-VALUE ITEMS (FEB 1997)|1|| ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (NOV 2023)|13|||||||||||||| BUY AMERICAN-FREE TRADE AGREEMENTS-BALANCE OF PAYMENTS PROGRAM CERTIFICATE-BASIC (FEB 2024))|5|||||| BUY AMERICAN--BALANCE OF PAYMENTS PROGRAM (FEB 2024)|1|| ROYALTY INFORMATION (APR 1984)|1|| ANNUAL REPRESENTATIONS AND CERTIFICATIONS (FEB 2024)|13|336413|1250|||||||||||| FACSIMILE PROPOSALS (OCT 1997)|1|| NOTICE OF PRIORITY RATING FOR NATIONAL DEFENSE, EMERGENCY PREPAREDNESS, ANDENERGY PROGRAM USE (APR 2008))|2||X| The purpose of this amendment is to reduce the quantity. The purpose of this amendment is to reduce the qty. ALL CONTRACTUAL DOCUMENTS (I.E. CONTRACTS, PURCHASE ORDERS, TASK ORDERSDELIVERY ORDERS AND MODIFICATIONS) RELATED TO THE INSTANT PROCUREMENT ARE CONSIDERED TO BE "ISSUED" BY THE GOVERNMENT WHEN COPIES ARE EITHER DEPOSITED IN THE MAIL, TRANSMITTED BY FACSIMILE, OR SENT BY OTHER ELECTRONIC COMMERCE METHODS, SUCH AS EMAIL. THE GOVERNMENT'S ACCEPTANCE OF THE CONTRACTOR'S PROPOSAL CONSTITUTES BILATERAL AGREEMENT TO "ISSUE" CONTRACTUAL DOCUMENTS AS DETAILED HEREIN. Early and incremental deliveries accepted and preferred. 1. SCOPE 1.1 Articles to be furnished hereunder shall be manufactured, tested and inspected in accordance with ;320-4-49753-101 OR 62002-5 IAW THE CURRENT REVISON.; drawing number ( ;320-4-49753-101 OR 62002-5 IAW THE CURRENT REVISON.; ) ;320-4-49753-101 OR 62002-5 IAW THE CURRENT REVISON.; , Revision ;320-4-49753-101 OR 62002-5 IAW THE CURRENT REVISON.; and all details and specifications referenced therein. 1.2 Unless expressly provided for elsewhere in this clause, equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, test equipment, or any other manufacturing aid required for the manufacture and/or testing of the subject item(s) will not be provided by the Government or any other source and is the sole responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing or referenced specification. 1.3 If MIL-STD-454 is referenced in the drawings or in the specification, the contractor is expected to show compliance with IPC/EIAJ-STD-001C. 2. APPLICABLE DOCUMENTS - NOT APPLICABLE 3. REQUIREMENTS - NOT APPLICABLE 4. QUALITY ASSURANCE I. First Article Test (FAT) Requirements.The following requirements applyto AMFUEL tank two or tank three. The tests to be performed under the FAT approval clause of the contract are:Conduct all testing required by AMFUEL Report 2122 Rev M:F-18 Acceptance Test Procedure (ATP)non- self-sealing fuel Cells with the exceptions.A Vacuum Bag Method Phenolphthalein Test shall be conducted on the fuel cell once all ATP testing has successfully been completed Folding: In lieu of folding the fuel cell at a temperature not less than 70� folding shall take place at 60-65� Folding: In addition to the test described in the ATP, after fuel cell is confirmed to be folded to the proper size,it shall remain folded for 30min then inspected per MIL-STD-801D.This test must be performed once prior to the final leakage test. Sealant Activation test: In lieu of stand testing the cell for a minimum of seven(7)days when using WK1473 type III fluid or ten(10) days using JP-4/JP-8 fuel, the cell shall be stand tested for minimum of thirty (30) days using JP-4/JP-8 fuel. II. Samples. The contractor shall present one (1) unit(s). At least 45 days before First Article Testing, the contractor shall notify the PCO, in writing, so that the Navy may witness the testing. III. Testing Location and Estimated Lead-Time. No arrangements will be made for inspection of the sample(s) until the DCMA notifies the PCO that the contractor has inspected the sample and i

Set-Aside: N/A (N/A)

Place of Performance: N/A, N/A, N/A

NAICS Codes:
336413

Here are other similar opportunities for you

TURBINE,AIRCRAFT CO

SAM.gov

Oct 12, 2026 Active

10--FITTING,BREECH

SAM.gov

Sep 21, 2026 Active

15--DUCT ASSEMBLY,HEAT EXC

SAM.gov

Sep 18, 2026 Active