Solicitation Number: 36C77625Q0112
Date Added: February 06, 2025
SYNOPSIS: INTRODUCTION: In accordance with Federal Acquisition Regulation (FAR) 10.002(b)(2), this Sources Sought Notice is for market research and information purposes only at this time and shall not be construed as a solicitation or as an obligation on the part of the Department of Veterans Affairs (VA). The Department of Veterans Affairs, Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) is conducting a market survey and is seeking potential sources for the EHRM Infrastructure Upgrades Data Center Construction project at the St. Louis VA Medical Center (VAMC) located at 1 Jefferson Barracks Dr., St. Louis, MO 63125. PROJECT DESCRIPTION: The St. Louis (Jefferson Barracks) VAMC is seeking a general contractor to furnish all labor, tools, materials, equipment, and supervision to construct a new EHRM Data Center in the Basement of Bldg. 56. The current data center in Bldg. 1 will be relocated to Bldg. 56. The scope of this project includes but not limited to the following infrastructure improvements: Electrical (power (normal, emergency), lighting), Bonding, UPS, Building Management System interfaces, assess for new HVAC, new space construction (walls, doors, finishes), fire suppression system, communication infrastructure (new Data outlets, patch panels, Cat 6A cable), physical security, fiber infrastructure backbone connectivity to MDA. PROCUREMENT INFORMATION: The proposed project will be a competitive firm-fixed-price contract utilizing the design-bid-build approach (Final Specifications and Drawings will be provided). The anticipated solicitation will be issued as either a Request for Proposal (RFP) in accordance with FAR Part 15, considering Technical and Price Factors or as an Invitation for Bid (IFB) in accordance with FAR Part 14. The results and analysis of the market research will finalize the determination of the procurement method. The type of socio-economic set-aside, if any, will depend upon the responses to this notice and any other information gathered during the market research process. This project is planned for advertising in March 2025. In accordance with VAAR 836.204, the magnitude of construction is between $5,000,000.00 and $10,000,000.00. The applicable North American Industry Classification System (NAICS) code is 236220 with a size standard of $45 million. The duration of the project is currently estimated at 240 calendar days from the issuance of a Notice to Proceed. The services for this project will include providing all construction related services such as: providing labor, materials and equipment required to complete the project as per contract documents prepared by an independent Architect-Engineer firm. The results and analysis of the market research will determine whether to limit competition among the small business categories, proceed with full and open competition as other than small business, or use a tiered set-aside evaluation. The type of socioeconomic set-aside, if any, will depend upon the responses to this notice and any other information gathered during the market research process. All socioeconomic categories are encouraged to respond to this announcement. CAPABILITY STATEMENT: Respondents shall provide a general capabilities statement to include the following information: Section 1: Provide company name, Unique Entity Identifier number associate with SAM.gov, company address, Point-of-Contact name, phone number and email. Section 2: Provide company business size based on NAICS code 236220. Also, provide business type (i.e., Large Business, Small Business, Service-Disabled Veteran Owned Small Business, Small Disadvantaged Business, Women-Owned Small Business, Hub Zone Small Business, etc.). Section 3: Provide a Statement of Interest in the project. Section 4: Provide the prime contractor s available bonding capacity in the form of a letter of intent from your bonding company with this submission. Section 5: Provide the type of work your company has performed in the past in support of the same or similar requirement. This section is IMPORTANT as it will help to determine the type of socio-economic set-aside, if any. Please provide the following in your response: No more than three (3) contracts that your company has performed within the last seven (7) years that are of comparable size, complexity, and scope to this requirement. Include the project name, project owner and contact information as this person may be contacted for further information, project scope, project size (Example: square footage), building use (Example: Medical Facility, Office Building, etc.), project dollar value, start and completion dates. Describe specific technical skills and key personnel your company possess to perform the requirements described under description of work. Describe your Self-Performed** effort (as either a Prime or Subcontractor). Describe Self-Performed work in terms of dollar value and description. **Self-Performed mean
Set-Aside: N/A (N/A)
Place of Performance: St. Louis, MO, N/A, UNITED STATES
NAICS Codes:
236220
Files:
SAM.gov
Jan 09, 2027 Active