Solicitation Number: 36C25925Q0178
Date Added: February 06, 2025
Performance Work Statement (PWS) Uninterruptible Power Supply Preventative Maintenance Department of Veterans Affairs (VA) Veterans Health Administration (VHA) (Brief Scope of Work) PURPOSE Veterans Affairs has a requirement for Uninterruptible Power Supply Preventative Maintenance services at the Eastern Oklahoma VA Health Care System (EOVAHCS). Services are to be performed in accordance with this PWS and to OEM standards, with the intent of ensuring the equipment operates as the original manufacturer intended, uninterrupted (95% uptime), in a cost-effective, efficient manner, contributing to the VA Mission. This is a non-personal services contract. The Contractor, its employees, agents and subcontractors shall not be considered VA employees for any purpose of fulfilling the SOW and shall be considered employees of the Contractor. C&A requirements do not apply, and a Security Accreditation Package is not required. LOCATION: Eastern Oklahoma VA Health Care System (EOVAHCS) 921 NE 13th St. Oklahoma City, OK 73104 TASKS AND REQUIREMENTS: Title of Project: Eaton Three Phase Uninterruptable Power Supply (UPS) Service Plan. Scope of Work: The contractor shall provide inspection and preventative maintenance on the Power Module and batteries annually. Battery replacement is not included. The UPS is located in building 22 at the Jack C. Montgomery VAMC. The C&A requirements do not apply, and a Security Accreditation Package is not required. Services include: 7x24 Emergency Service Coverage including parts, labor and travel Annual 5x8 Preventive Maintenance Inspection Annual 5x8 Comprehensive Battery Inspection Eight (8) Hour (maximum) Response Time Web Access to Service History Background: UPS is utilized at the Jack C. Montgomery VA Medical Center to prevent any power fluctuations that may affect any computer equipment in the server room. Equipment to be covered is: Eaton 9355-30 Serial Number EA024KXX10 Description of Tasks and Associated Deliverables: The contractor shall provide inspection of all UPS components and batteries in accordance with manufacturer s recommendations. If for any reason, any deliverable cannot be delivered on time according to the below schedule, the contractor shall provide a written explanation three days prior to the due date to the Contracting Officers Representative (COR). This written transmittal shall include a firm commitment of when the work shall be completed. This transmittal shall include a firm commitment of when the work shall be completed. This transmittal to the COR shall cite reasons for the delay and the impact on the overall project. The COR will review and issue a response in accordance with the contract terms and conditions. Specifically, the contractor shall: Task One: The contractor shall inspect all UPS components in accordance with manufacturer s recommendations. Corrective Maintenance Coverage: Inspection and repair of the electronic portion of the UPS (or other equipment type), or Power Module Deliverable One: Visual Inspection Inspect all printed circuit board connections for cleanliness, swab contacts if necessary. Inspect all power connections for signs of overheating. Inspect all subassemblies, bridges and legs for signs of component defects or stress. Inspect all DC capacitors for signs of leakage. Inspect all AC capacitors for sings of leakage. Inspect and inventory all customer-owned spare parts. Inspect for, and perform as required, any open engineering changes. Internal Operating Parameters DC Ground Detection Offset (if applicable) Inverter leg current average balance (if applicable) Output filter current average phase balance Rectifier bridge current average leg balance AC Protection settings are checked DC Protection settings are checked Input and Output Frequency and Voltage Bandwidth settings are checked Verify DC filter capacitance Verify AC tank and trap filter capacitance Power Supply voltages and waveforms External Operating Parameters System Input Voltages (all phases) System Input Currents (all phases) DC Charging Voltages (float and equalize), record settings, adjust to nominal Rectifier phase on and walk up Inverter phase on and walk up Adjust all panel meters to measured values System Bypass Voltages (all phases) Manual and UV Transfer testing, verify uninterrupted transfer waveform (if applicable) Outage simulation and battery capability testing and verify charger current limit Generator operation and interface verification (if applicable) Environmental Parameters UPS area ambient temperature and condition of ventilating equipment General Cleanliness of UPS Power Module General Cleanliness of UPS area Replace all air filters Clean control panel/CRT screen Flywheel only: Drain oil and change oil and filters Battery Cabinet Checks General appearance of Battery System General cleanliness of Battery system area Inspect cells for physical abnormalities Inspect all DC connections for abnormaliti
Set-Aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14) (SDVOSBC)
Place of Performance: Muskogee, Oklahoma, UNITED STATES
NAICS Codes:
811210
Files:
SAM.gov
Sep 16, 2026 Active