Opportunity Details

Solicitation Number: 6982AF25B000001

Date Added: January 07, 2025

Description:

PROJECT NUMBER:  NM ERFO FS SNTFE 2022-1(1)

PROJECT NAME:  EL PORVENIR BRIDGE

PROJECT DESCRIPTION:  The purpose of this project is to replace the previous bridge which was destroyed in the Hermits Peak/ Calf Canyon fire in April 2022. The bridge is located in the Santa Fe National Forest, approximately 17-miles northwest of Las Vegas, NM.

The project is considered 4R and located in Mountainous terrain.

SCOPE OF THE WORK:  The proposed improvements include a new bridge west of the previously destroyed structure. The replacement bridge is planned to be a prefabricated steel structure with a span of 97 feet and a width of 16 feet. The bridge will be founded on drilled shafts with a structural metal decking and reinforced concrete topper. In addition, the scope includes removal of an existing low water crossing, which is serving as a temporary diversion for traffic along the route, and obliteration of a portion of the existing road. Embankment work will be required for the realignment of the aggregate surfaced road.

Set-Aside: Total Small Business Set-Aside (FAR 19.5) (SBA)

Place of Performance: Las Vegas, New Mexico, UNITED STATES

NAICS Codes:
237310

Files:

Here are other similar opportunities for you

Jake Rocks Road Reconstruction

SAM.gov

Nov 05, 2026 Active

ND NP THRO 204(1) Buck Hill Road

SAM.gov

Nov 03, 2026 Active

TX FW LGA 10(5) Steve Thompson Wildlife Drive

SAM.gov

Nov 03, 2026 Active