app.rfpplanner.com

Opportunity Details

Solicitation Number: 6982AF25B000001

Date Added: January 07, 2025

Description:

PROJECT NUMBER:  NM ERFO FS SNTFE 2022-1(1)

PROJECT NAME:  EL PORVENIR BRIDGE

PROJECT DESCRIPTION:  The purpose of this project is to replace the previous bridge which was destroyed in the Hermits Peak/ Calf Canyon fire in April 2022. The bridge is located in the Santa Fe National Forest, approximately 17-miles northwest of Las Vegas, NM.

The project is considered 4R and located in Mountainous terrain.

SCOPE OF THE WORK:  The proposed improvements include a new bridge west of the previously destroyed structure. The replacement bridge is planned to be a prefabricated steel structure with a span of 97 feet and a width of 16 feet. The bridge will be founded on drilled shafts with a structural metal decking and reinforced concrete topper. In addition, the scope includes removal of an existing low water crossing, which is serving as a temporary diversion for traffic along the route, and obliteration of a portion of the existing road. Embankment work will be required for the realignment of the aggregate surfaced road.

Set-Aside: Total Small Business Set-Aside (FAR 19.5) (SBA)

Place of Performance: Las Vegas, New Mexico, UNITED STATES

NAICS Codes:
237310

Files:

Here are other similar opportunities for you

Z--PERMANENT PAVEMENT MARKING

SAM.gov

Sep 15, 2026 Active

Selkirk to Surf Road Maintenance

SAM.gov

Sep 21, 2026 Active